Calculation Methodology
Converts nominal interest, premiums and fees into a comparable all-in annualised financing cost rate. Two methods: IRR (preferred) and simple-interest approximation.
Unified formulas
| Method | Formula | Description |
|---|---|---|
| IRR (exact) | P = Ξ£ CFβ/(1+IRR)α΅ | List cash flows period by period and solve NPV=0; the regulator-recommended method |
| Approximation | (Interest + premium + fees) / employed Γ 360/d | Ignores fee timing; usually slightly below IRR |
| Average funds employed | PΓ(N+1)/(2N) | Equal-principal repayment over N periods |
| Annualised premium | F_prem/(PΓT) | One-off premium amortised |
Formula quick reference β six products
| Product | Approximation | IRR cash flows |
|---|---|---|
| Factoring | (Interest + factoring fee) / (advance β deposit) Γ 360/d | [advance β deposit β fee, β(advance + interest β deposit)] |
| Buyer's Credit | (Interest + fees + premium) / (average employed Γ T) | [P β fees, per period β(P/N + interestβ)] |
| Concessional Loans | r_mix = Ξ± Γ r_pref + (1βΞ±) Γ (r_com β s); rest as above | Same as Buyer's Credit |
| Forfaiting | (FV β net) / net Γ 360 / (d + grace) | [net, βFV] |
| Leasing | Solve the implied rate from the annuity; IRR is primary | [P(1βqβb) β fees, βA Γ N, + deposit] |
| Order Financing | (Interest + fees) / (financing β deposit) Γ 360/d | [financing β deposit β fee, β(financing + interest β deposit)] |
Reconciliation example (factoring)
Face value 1,000,000 β advance 800,000; deposit 100,000 (10% of face); interest = 800,000 Γ 7% Γ 90/360 = 14,000; factoring fee = 1,000,000 Γ 0.8% = 8,000; funds employed 700,000.
Annualised = (14,000+8,000)/700,000 Γ 360/90 = 12.57% β (IRR runs slightly higher)
Annualised = (14,000+8,000)/700,000 Γ 360/90 = 12.57% β (IRR runs slightly higher)
Points to watch
- Compare on a consistent basis; never compare headline rates alone β deposits, deducted interest and fee timing all mislead
- Deposits / deducted interest must be netted off usable funds
- The 360/365 basis and grace period must match the contract
- Subsidies and grants enter cash flows as offsets